Full Lane Closure (Inbound) And Road Diversion Along Jurong Island Highway Near LP55 To LP80

18 Aug 2021

Ref No: 180821 (1)
UEN: S97SS0046G

Please note that there will be a full lane closure for the inbound lanes along Jurong Island Highway (JIH) near Lamp Post 55 to Lamp Post 80 due to Pipe Bridge erection and installation works on 21/22 & 28/29 August 2021 from 2030 hrs to 0530 hrs.

During this period of time when construction is underway, inbound vehicles travelling along JIH (see images below) will be diverted towards 2 lanes in the outbound direction.

Traffic controllers will be present to direct the traffic along the affected area. All drivers are advised to slow down, be cautious and adhere to the traffic controllers’ instructions at all times. Please refer to the Traffic Control Plan for details on the road closure and traffic diversion.

Should you have any queries on the road closure and diversion, please feel free to contact the contractor, Rotary Engineering P/L (6866 0800) or Baghel Rajkumar (96831640).

Kindly disseminate this email to your staff and drivers who may be driving along JIH during this period of time.

We thank you for your understanding and please continue to drive safely.

JIH Inbound Full Lane Closure & Diversion Plan between Lamp Posts 55 – 80

Start of JIH Inbound Full Lane Closure near Lamp Post 55

End of JIH Inbound Full Lane Closure near Lamp Post 80

Our Warmest Regards,

ASPRI Secretariat
admin@aspri.com.sg

Scroll to Top